Executive director  

084/660631

Chief accountant  

084/660628

Engineering department  

084/660629
Concrete workshop    084/660615

Fax  

084/660630

7200 Razgrad, 45 "Beli Lom" Blvd.

WEB: www.stroitel.domino.bg

 

The "Stroitel" EAD (JSC) - Razgrad is a legal successor to the Obshtostoritelno Predpriyatie (General Building Enterprise) under the SMK (Integrated Erecting Works) - Razgrad, and later the municipal firm "Stroitel". The enterprise was privatized on  31.03. 2000. The management-and-employee company "Stroitel-99" OOD (Ltd.) is the owner of 100% of the shares.

We have an established position in high-rise building by the systems large-area formwork, packet-lifting plates and all kinds of monolithic construction of residential, cultural and industrial buildings, reconstruction and repair work.

Almost all impressive buildings in the ton of Razgrad were built by our firm: the new Dramatic Theatre, the Trading Centre and the Regional Health Insurance Fund, the residential districts "Osvobozhdenie" and "Mladi Semeistva", the annex to the Economical Technical School, the animal market in the village of Getsovo, the reconstruction of the buildings of the Foreign Language Secondary School, the Bulbank, the First Eastern International Bank and the town stadium. We participated successfully in the Beautiful Bulgaria Project in Razgrad last year. We completed the following objects under the project: the building of the Regional Directorate of Internal Affairs, the Army Club, the Club of the Officers of the Reserve.

We specialize in the performance of the following erecting work: excavation, formwork, reinforcement, concreting, masonry, plastering, painting, tinsmith's, and also waterproofing work with gas-flame sticking, construction of light separating walls, hung ceilings, electric and plumbing installations of buildings, flooring, lining and facing.

We have the following material and technical foundation:

- Concrete workshop with the only licensed testing laboratory for building materials in the district

- Fittings workshop

- Lime workshop

- Joinery

- Vehicles for the transport of concrete, mortars and building materials

- Excavator and crane

- Equipment for the systems large-area formwork and monolithic construction

- Heavy prop frame and facade frame sets

Despite of the crisis in our branch and the serious reduction in investments in construction we managed to preserve our qualified engineers and building workers. The average number of our staff is 217 people at the moment.

We have established our company as a sub-agent of the "Glavbolgarstroy". As such we carried out the complete construction of 427 apartments in Russia and Ukraine in the period 1992-1997. We continue our cooperation with the "Glavbolgarstroy-Sofia" AD (JSC). We participated in the construction of the Hilton Hotel and the term dwellings of the MPs and the reconstruction of the Central Department Store. We are building at the Slatina Market and the Centre for Guidance of the Aviation - Sofia.